Friday, May 22, 2009

Flatwork

5/22/09 Today we have wet concrete.


5/22/09


5/22/09


5/22/09


5/22/09

Interior Walls

Cesar Medina, with PremRock Ltd. These guys are doing all the drywall and the American Clay plaster.

Wednesday, May 20, 2009

Part of the Team!

Toby Velasquez (l), with PDC, Inc.-- the person in charge of all the flatwork, and David Hocker (r) with Hocker Design, the company doing the landscape design.

Flatwork

5/20/09


5/20/09 Forms for the carport.

Flatwork

5/20/09


5/20/09


5/20/09 Putting up the forms for the walks.

Monday, May 11, 2009

Publicity

5/11/09 We were happy to have GreenBuildingAdvisor.com visit our site to check in and see how our project was coming. They are interviewing Wayne Atkins.

Tuesday, May 5, 2009

Fireplace

5/5/09 Fireplace surround moving ahead...

Exterior Walls

5/5/09


5/5/09 Brown Coat finishing up & Narrowing down colors for final stucco.

Photovoltaics

5/5/09


5/5/09


5/5/09


5/5/09


5/5/09 There are two arrays like this one with 6 panels.


5/5/09 Here is the other. Those two in the back are for solar hot water.