Tuesday, July 29, 2008

7/29/08
7/29/08. Rows of Durisol are dry-stacked then concrete is poured inside to make the wall one monolithic structure. Rebar comes up through the center for reinforcement.

Thursday, July 17, 2008

Foundation Poured

Old swimming pool in foreground. 7/17/08


7/17/08


7/17/08


July 2008 foundation is poured

Tuesday, July 1, 2008

July 1, 2008. The pool from the old house was saved. It will be a cistern holding rainwater for irrigation. The plan is to create a void with plastic milk-crate-like stackable structural cubes, then cover the entire group with material allowing water to collect and be retrieved.