6/8/09 This is what the entry looks like today.
6/8/09 Oklahoma Flagstone delivered for pool.
6/8/09 Some door hardware installed.
6/8/09 Forms for backyard flatwork finished today.
6/8/09 Kitchen Island
6/8/09 Kitchen
6/8/09 Kitchen
6/8/09 Cubbies for coats & other things.
6/8/09 Kitchen cabinet drawers fill kitchen.
6/8/09 Away Room floor tile down.
6/8/09 Hardie Backer for Master bath before floor tile is installed.
6/8/09 Forms for step stones outside back door.
6/8/09 Shared Bath
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment