Monday, June 8, 2009

6/8/09 This is what the entry looks like today.


6/8/09 Oklahoma Flagstone delivered for pool.


6/8/09 Some door hardware installed.


6/8/09 Forms for backyard flatwork finished today.


6/8/09 Kitchen Island


6/8/09 Kitchen


6/8/09 Kitchen


6/8/09 Cubbies for coats & other things.


6/8/09 Kitchen cabinet drawers fill kitchen.


6/8/09 Away Room floor tile down.


6/8/09 Hardie Backer for Master bath before floor tile is installed.


6/8/09 Forms for step stones outside back door.


6/8/09 Shared Bath

No comments:

Post a Comment